Commissioning
We install and test systems in our own facility first, ship them after acceptance tests, and commission them with minimal disruption to your production.

Commissioning is the final stage after project planning, design and manufacturing, and it decides the success of the project on site. Before shipping, the system is installed and run in our own facility, and in the factory acceptance test (FAT) cycle time, safety functions and inspection rates are validated together with our customer.
On site, mechanical installation, electrical connections and robot and PLC communication are commissioned, and the site acceptance test (SAT) measures the system's performance under real production conditions. We plan the installation around your production schedule to keep downtime to a minimum.
Operator training, maintenance documentation and a spare parts list are part of the delivery, and the same team keeps supporting you after commissioning.
Highlights
- Factory acceptance test (FAT)
- Site acceptance test (SAT)
- Installation planned around production
- Operator training
- Maintenance documentation
- Support after commissioning