Commissioning
Commissioning is the last stage after project planning, design and manufacturing: systems are tested in our own facility first and shipped once they pass.

During commissioning, the systems we test in our own facility must first pass our acceptance and be confirmed to work efficiently on the target site. In the factory acceptance test (FAT) cycle time, safety functions and inspection rates are validated together with the customer.
On site, mechanical assembly, cabinet wiring and communication are commissioned; the site acceptance test (SAT) measures performance under production conditions. Operator training, maintenance documentation and a spare-parts list are part of delivery.
Highlights
- Factory acceptance test (FAT)
- Site acceptance test (SAT)
- Operator training
- Maintenance documentation
Application areas
- New line installation
- Existing line conversion
- Relocation / recommissioning